01
Lincoln MRL-500
8 pcs
630 kg · 1.75 m/s · 12 floors · MRL
Cheremushki-2 is the second phase of a popular residential complex in a green area of Astana. Eight Lincoln MRL-500 passenger elevators were installed in a turnkey configuration.
The project was delivered with a full service cycle from design to certification, ensuring compatibility with the first phase.
Elevator equipment compatibility with the first phase for a unified maintenance system.
The elevators of both phases are now serviced under a single contract.
Passenger-flow calculation, equipment selection, turnkey installation and 5-year service.