The KTZ Building is the tallest administrative building in Kazakhstan and home to the largest media facade in Central Asia. 34 floors of usable height plus a 17-meter steel spire-lightning rod.
The complex required a high-speed elevator group supporting intense passenger flow during morning and evening hours. Eight Fujitec Zexia passenger elevators were installed with group control and an intelligent call-allocation algorithm.
The building's height required ±1 mm stopping accuracy even on the upper floors and active damping of horizontal sway from wind. Seismic resistance to magnitude 9 was also required.
The elevators have served the building since 2019 without a single failure. Average wait time — 28 seconds at peak hours.
Details
facility
- Floors
- 34 floors · 175 m with spire
- Area
- 110 000 m²
- City
- Astana
- Address
- г. Астана, ул. Динмухамеда Кунаева, 6
- Client
- АО НК «Қазақстан темір жолы»
- General contractor
- НК «КТЖ»
- Architect
- Kazakh architectural firms
- Duration
- 11 months
- Contract date
- January 2019
Installed
equipment
What we did
-
01Elevator group design
-
02Passenger-flow calculation
-
03Equipment supply from the Fujitec factory
-
04Supervised installation works
-
05Commissioning works
-
06Certification and commissioning
-
07Technical staff training
-
0824/7 service maintenance
Project timeline
Specifications
- Elevator model
- Fujitec Zexia
- Quantity
- 8 pcs
- Load capacity
- 1,250 kg (16 passengers)
- Speed
- 4.0 m/s
- Travel height
- 120 m
- Number of stops
- 34
- Drive type
- Gearless VVVF Fujitec MR-T
- Group control
- Yes, 8 elevators in a group
- Seismic resistance
- magnitude 9
- Stopping accuracy
- ±1 mm
Other completed
facilities
We deliver a similar project
Passenger-flow calculation, equipment selection, turnkey installation and 5-year service.