Ken Dala 2 is the second phase of a large residential quarter. Ten Asia-sigma Standard passenger elevators with group control were installed.
Group operation in sections with 3 elevators ensures optimal wait times during peak hours.
Synchronizing commissioning with the complex's first phase and integrating into the shared dispatch system.
All 10 elevators operate in sync with the first phase under unified dispatch.
Passenger-flow calculation, equipment selection, turnkey installation and 5-year service.