Description
project
The new Nurly Zhol railway station is one of the largest transport hubs in Kazakhstan, with a capacity of over 35,000 passengers per day. Four high-capacity Fujitec Rexia passenger elevators were installed for transporting passengers with luggage.
The project included integration with the building management system (BMS) and equipment for passengers with reduced mobility. A long-term service contract was additionally signed.
High passenger flow with luggage required larger cabins and increased duty-cycle intensity. Installation proceeded without halting construction of the main building.
The elevators operate around the clock with a 99.7% availability rate in the first year of operation.
Details
facility
- Floors
- 5 floors
- Area
- 126 000 m²
- City
- Astana
- Address
- г. Астана, пр. Жеңіс, 91
- Client
- АО НК «Қазақстан темір жолы»
- General contractor
- Транспорт-холдинг
- Duration
- 12 months
- Contract date
- May 2017
Installed
equipment
What we did
-
01Elevator group design
-
02Equipment supply from the Fujitec factory
-
03Supervised installation works
-
04Commissioning works
-
05Certification and commissioning
-
0624/7 service maintenance
Project timeline
Specifications
- Elevator model
- Fujitec Rexia
- Quantity
- 4 pcs
- Load capacity
- 1,600 kg (21 passengers)
- Speed
- 2.0 m/s
- Type
- MRL with extended cabin
- Drive
- Gearless VVVF Fujitec
- Control
- Group, BMS integration
- Accessibility
- Full accessibility equipment
Other completed
facilities
We deliver a similar project
Passenger-flow calculation, equipment selection, turnkey installation and 5-year service.