01
Lincoln MRL-500
8 pcs
630 kg · 1.75 m/s · 12 floors · MRL
Sezim Qala 4 is the fourth phase of a large residential quarter. Eight Lincoln MRL-500 passenger elevators were installed in a turnkey configuration.
Full cycle: design, supply, installation, commissioning, certification. Standardized with the previous phases for unified service.
Coordinating equipment with previous phases and a shared service contract.
The elevators are standardized with phases 1–3, simplifying maintenance for the management company.
Passenger-flow calculation, equipment selection, turnkey installation and 5-year service.